HWS Expansion |
|
|---|---|
|
Mike 13 Jun 12 at 20:59 |
Hi, Can anyone provide a reference or guidance material for sizing expansion vessels for unvented HWS? We have two large Hamworthy Direct Gas Fired Calorifiers and need to convert them from open vented with F&E tank to unvented mains fed. All of the vessel manufacturer calculation methods I have found assume the total system volume is known. The syetm is part of a 9 storey building which has been modified over the years and I have no usable as fitted info. Is there an approved method of estimating system volume, similar to that used for sealed heating systems??? Any guidance greatly appreciaited. Mike
|
[1] |
|