- Standard Rate
- FREE
- Member Rate
- FREE
Back to 2016 Symposium Overview
Session 7 Paper 1, Heriot-Watt University Edinburgh, 14-15 April 2016
Download full paper using download links above
BIM is revolutionising the way we design buildings and share design data, but most construction workers’ site duties remain unchanged. In an increasingly BIM-centric industry - with 3D collaborative models and post-occupancy analysis – it is clear that the site based pen and photocopy remain a stumbling block to collaboration. The impact is evidenced in the Performance Gap and the consistency with which projects run over budget and programme. This paper will review how technical co-ordination and realisation stands to benefit from a rethink of communication. This paper will introduce ACCEPT - a multi national research project funded by H2020, as a prospective means to improve knowledge transfer and quality assurance on site through the use of digital technologies such a tablets and smart glasses.