Skip to main content
Back To CPD Directory

Crane Building Services & Utilities

Crane Building Services & Utilities
1. Proportional Balancing To give an overview of Proportional Balancing within the commissioning process. This process applies to both constant & variable flow heating and chilled water systems. 2. Thermal Circulation Valves - Protection Against Legionella An overview of how to eliminate the bacterium Legionella Pneumophila, which causes Legionnaires' disease, from our domestic hot water systems. Covers History, High Risk Systems, Growth considerations and counteractive processes and measures that can be taken, primarily the use of Thermal Circulation Valves. 3. Variable Volume System - Utilising DPCVs To give an overview of Variable Volume systems within the scope of Differential Pressure Control Valves. Covers History, Application, Selection and Commissioning. 4. Variable Volume System - Utilising PICVs To give an overview of Variable Volume systems within the scope of Pressure Independent Control Valves. Covers History, Application, Selection and Commissioning. 5. Variable Volume System - Utilising DPCVs and PICVs (Option 3 & 4 combined) A combination of the DPCV and PICV modules.
  • Building Design
  • Energy Efficiency
  • Health
  • HVAC
  • Mechanical
  • Plumbing & Pipework
Mechanical;HVAC;Building Design;Energy Efficiency;Plumbing & Pipework;Health
Neil Gibson MEng CEng MIMechE - Technical Manager UK
Mark Walker - Technical Specification Engineer
Nick Boyle - Technical Specification Engineer
Steve Clarke - Technical Specification Engineer
Ahmad Marzouk - Technical Manager MEA
5
Seminars or Webinars;Online and Video Learning;On Site at Provider’s Location;On Site at Our Location;Workshops;Presentations;Questions and Answers;E-Learning;Lunch & Learn
1 hr
Free of Charge
01/07/2023
30/06/2025
  • East Anglia England
Share this page